Factory inspection and site inspection address different portions and stages of a modular project. They should form a coordinated verification process rather than competing claims that one inspection covers everything.
Identify concealed factory work
Modules may contain structure, wiring, plumbing, and other assemblies that are closed before delivery. The applicable approval process determines how that work is reviewed and documented at the factory.
ICC's off-site construction guidance includes in-plant and on-site inspection roles. Ask the supplier and authorities to confirm the specific route for the destination, including required documentation accompanying the units.
Identify work completed locally
Foundations, installation, module joints, utility connections, exterior access, and site-built additions can require separate checks. A factory record does not establish that these later activities have been completed correctly.
For example, a plumbing system checked during production may still need the required verification after transport and final connection. The project team should define the full testing sequence.
Close the information loop
Use a register that links factory records, receiving checks, site inspections, and unresolved items to the relevant modules and systems. Establish how a field change affects previously approved information.
Confirm who coordinates final submissions and the conditions for occupancy or use. Avoid planning move-in based only on the expected date of module delivery.
Owners should request an inspection responsibility map before production starts. It should show what is checked, by whom, at which stage, and how findings are resolved. That gives the owner a coherent account of the completed building instead of separate certificates whose boundaries are difficult to understand.