A site is ready for modular delivery when the installation team has verified the conditions needed to receive and place the actual units. Completed foundations are essential, but they are only one part of readiness.

Check the installation area

Review access routes, staging, lifting locations, ground conditions, obstructions, and required clearances with the responsible specialists. The plan must account for the specific vehicles, equipment, modules, and sequence.

Ask how underground services and recently completed work are protected. An apparently open area may not be suitable for heavy equipment without the required assessment.

Verify geometry and interfaces

Confirm foundation position, levels, connection details, and service locations against the current supplier information. Resolve discrepancies before shipment where possible.

For example, a small mismatch between a foundation connection and a module interface can have consequences beyond setting the unit down. The team needs an approved resolution rather than an improvised field adjustment.

Make readiness a documented decision

Create a project-specific checklist with the installer, supplier, and site contractor. Include required inspections, permits or releases, access permissions, weather protection materials, and the people needed for connections.

Identify who has authority to confirm readiness and communicate that decision to the factory and transport team. A target date on a schedule is not the same as a completed readiness review.

Prepare for the work immediately after placement, including temporary protection and restricted access. The owner's objective is a controlled transition between production and site assembly. A documented release prevents pressure to accept delivery from overriding unresolved conditions that could affect safety, damage, cost, or the ability to complete the building.