Modular quality control should produce evidence that specified work was checked at appropriate stages. A factory tour can show organization and workmanship, but it does not replace a project-specific quality plan and records.
Ask what is inspected and when
Review the proposed checkpoints for structure, concealed services, enclosure, finishes, and testing. Identify which checks are internal to the manufacturer and which involve the relevant inspection or approval body.
ICC's off-site construction resources describe the role of factory review and inspection, including closed construction that can be difficult to inspect later. Ask how that process applies to the proposed building and destination.
Connect records to individual modules
Use consistent identification for drawings, inspections, material information, and outstanding issues. A general statement that the factory follows quality procedures is less useful than records showing what happened to the units being purchased.
For example, a repeated plumbing detail may be checked before every wall is closed, with the inspection record tied to the module. That allows a later question to be investigated more precisely.
Include the trip and the site
Quality responsibilities continue through packaging, transport, installation, and final connections. Establish receiving inspections and a process for damage, nonconformances, and corrective work.
Ask who approves a repair and how it is documented. A closed factory issue can become relevant again if the assembly is altered at site.
Before handover, reconcile outstanding items with the final inspection and testing records. The owner should receive traceable evidence and a clear defects process, not merely a certificate implying that every aspect of the completed development was covered by factory production controls.