On site
From flat to full height
A complete wall panel lifts from the ground into position. Wide view, shown at 3× speed.
The Livio video library
From factory assembly to the final lift.
Short clips from Livio projects and assembly demonstrations.
12 videos
On site
A complete wall panel lifts from the ground into position. Wide view, shown at 3× speed.
Factory
Steel members assembled on the factory jig.
On site
A panel rack is unloaded at the warehouse.
On site
A close-up of the lifting-clamp connection.
On site
Two full-height panels are raised, positioned and braced.
On site
Close-up footage of the panel-base anchor connection.
On site
A closer look at the joint between adjacent panels.
On site
A third panel is lifted and positioned beside the standing walls.
On site
A large roof panel is lowered onto the Smart Shell walls.
Timelapses
A condensed sequence from the Livio Gen 2.1 assembly demonstration.
Timelapses
Watch the structure rise from its first panels to the upper floors.
On site
Preassembled closed-wall panels lifted and positioned on site.