A building.
Built in panels.

Traditional designs. Modular speed. We panelize buildings under 15 stories, coordinate the components, and bring them together on site.

Explore the assembly
SMART SHELL · FROM STEEL TO DATA HALLSkip assembly

Steel frame

It starts with steel.

Cold-formed steel studs slot into tracks. Individual blocking pieces complete the frame.

Wall panel · 2.00 × 7.00 m

Illustrative assembly · Scroll to build, or choose a stage.

MULTI-TRADE PANELS

More of the building.
Built in.

Structure, services and finishes, coordinated before fabrication. Explore a representative wall, floor and roof assembly.

Realistic building corner cutaway showing galvanized steel framing, electrical conduit, plumbing, mineral wool, exploded wall sheathing, rigid insulation, weather wrap and facade, with a window, floor cassette and open-web roof joists.
Illustrative multi-trade assembly. Materials, services and finishes are configured for each project.
01

Cold-formed steel

Galvanized studs, tracks and engineered shear or bracing members form the panel structure.

FROM FACTORY TO SITE

Designed to connect.

Fabrication resolves the details early. Site work connects the coordinated parts.

Panelize the design

  • Break the building into wall, floor and roof panels.
  • Coordinate openings, structural members, connections and service routes.
  • Plan shipping sizes, panel identification and erection order.

Build the assembly

  • Form and assemble cold-formed steel studs, tracks and blocking.
  • Integrate specified electrical and plumbing rough-in.
  • Fit insulation, bracing, MgO boards and envelope layers.

Lift, align and connect

  • Prepare the foundation and setting-out locations.
  • Lift the panels in sequence; align, brace and connect them.
  • Install floor and roof panels and complete the enclosure.

Complete the interfaces

  • Make plumbing and electrical connections at accessible locations.
  • Complete panel joints, weather seals and specified finishes.
  • Inspect and test the installed systems before handover.

Panel dimensions, structural details, fire performance and integration are engineered for each project. The model explains the sequence; project drawings govern construction.

THE PROCESS ON SITE

See the connections.

Livio’s Closed Wall Panel System · Rapid Construction Gen 3.0 · Full 6:06 film

Follow the sequence

  1. Align & fasten · 1:00Matching wall tracks align; screws make the wall-to-wall connection.
  2. Connect the floors · 1:30Accessible underside fasteners, upper-wall anchor bolts, and panel names with directional arrows.
  3. Connect plumbing · 2:50PEX, vent and drain connections at the service interfaces.
  4. Complete electrical · 3:30Pull wiring through conduit into junction boxes; join wires with lever-nut connectors.
  5. Install the finish · 4:40Fluted cladding over weather wrap and rails; stone facing supported on angles with pins.

Factory-built components become a connected building through planned site interfaces.

Real panels. Real installation.

Wall panel installation4×
Roof panel installation4×

Watch it
come together.

See the five-story erection demonstration, the two-story house build, and completed project photographs.

Explore the projects