Cheap electricity can make a data center site attractive, but a low advertised rate does not establish a viable development. The facility also needs deliverable service, a workable schedule, connectivity, suitable land, an operating team, and an acceptable total cost of ownership.
Begin by separating the price question from the capacity question. A tariff or indicative energy price does not prove that the proposed load can be served at the required location and time. Utility studies, agreements, construction responsibilities, and delivery milestones need their own review. An inexpensive theoretical supply cannot operate a completed hall.
Next, examine what the site requires to become usable. Difficult grading, constrained equipment yards, inadequate access, or a complex connection route can outweigh a favorable energy assumption. Network availability also needs physical evidence; proximity to a route is not the same as an agreed service arrangement.
Operating costs extend beyond energy. Maintenance access, staffing, spare parts, water where used, testing, and equipment replacement all affect the long-term plan. A remote site might offer land advantages while requiring a more deliberate service strategy. That tradeoff should be visible in the comparison.
Build a site scorecard with separate lines for service evidence, delivery risk, total infrastructure cost, operating practicality, and expansion options. Use ranges where information is incomplete instead of hiding uncertainty in a single attractive price.
The right decision is the site that can support the intended business reliably and economically under documented assumptions. Electricity price belongs in that analysis, but it should not make the decision on its own.