Power and fiber deserve early attention because a data center needs both energy and connectivity to serve its intended users. Neither can be established by observing infrastructure near the property. The practical question is whether suitable service can reach the proposed facility on acceptable terms and timing.
For power, prepare a phased load description and ask the utility how it would evaluate service. Identify the connection location, required studies, potential construction responsibilities, and milestones for further decisions. Keep the response tied to the stated load and date; a discussion about a smaller use may not support a later expansion.
For fiber, ask providers about actual service options, physical routes, building entry arrangements, and delivery dependencies. Multiple provider names do not automatically establish physically independent paths. The network team should review the route evidence against the application’s needs and the facility’s continuity strategy.
Place both utilities on the same site drawing. Their routes may interact with roads, drainage, security boundaries, future buildings, and third-party property. A connection that appears straightforward in a sales conversation can become complicated when the physical corridor is examined.
Track evidence separately for each service. Record the provider, scope discussed, assumptions, required agreements, and next action. Avoid converting an indicative conversation into a public capacity claim.
A parcel with one strong utility story and one unresolved essential service still has a major feasibility question. Resolving those questions early helps the owner decide which sites deserve detailed design spending and which need further investigation first.