An underground utility survey provides information about buried infrastructure, but its confidence depends on the methods used and the evidence available. A line on a drawing should be read with its source and limitations attached.

Ask how the information was obtained

Records research, surface observations, detection methods, and physical exposure can provide different levels of information. FHWA's subsurface utility engineering guidance distinguishes quality levels to communicate those differences.

Ask the surveyor or utility specialist which methods apply to each important feature and where uncertainty remains. A drawing compiled from historic records should not be treated as equivalent to a verified location at a specific excavation point.

Separate location from capacity

Knowing where a service runs does not establish whether it is active, suitable, available for connection, or adequate for the proposed demand. Those questions require coordination with the responsible provider and design team.

For example, a pipe shown near a proposed building may be relevant to planning, but its presence alone does not confirm a usable water connection. Keep service feasibility and physical location as related but distinct workstreams.

Use the findings in construction planning

Identify conflicts between proposed foundations, trenches, and existing services. Determine where further verification is needed before design or excavation proceeds. Follow applicable utility notification and excavation procedures; a project survey does not automatically replace them.

Maintain a record of discoveries and changes during construction so the handover information improves on the starting drawings. The owner's objective is not an unrealistic promise that every buried object has been found. It is a clear understanding of what is known, how reliably it is known, and what further action is required.