Post-occupancy evaluation examines how a completed building works for the people using and maintaining it. It turns design assumptions into questions that can be checked through experience and operating information.
Choose a focused scope. Comfort, room use, circulation, maintenance access, and system controls are useful starting points. Avoid an enormous survey that collects comments without a clear way to act on them.
Gather several kinds of evidence. User interviews reveal experiences, observations show behavior, and operating records can identify patterns. Record location, time, occupancy, and weather where relevant so that a complaint can be connected to conditions.
Separate issues by cause. A room may be underused because it is hard to book, poorly located, uncomfortable, or simply unnecessary. These possibilities require different responses. Do not assume that every problem needs construction work.
Review findings with the operating and design teams. Identify quick operational changes, items requiring technical investigation, and lessons for future projects. Assign an owner and a verification step to each action rather than ending with a general report.
Repeat selected checks after changes. If shading controls are revised, ask whether glare reports decrease at the affected positions. If a room layout changes, observe whether its intended use improves.
Keep the evaluation proportional and respectful of occupants' privacy. The purpose is to improve the building and future decisions, not to attribute blame. A useful evaluation closes the loop between what the project intended, what users experience, and what can be changed.