A sitework proposal should explain how the contractor will transform the existing property into the conditions required by the project. Review quantities, assumptions, interfaces, and exclusions before comparing its total with another offer.
Match the information basis
Confirm the survey, grading plans, utility drawings, and geotechnical information used for pricing. Ask whether the proposal includes the latest revisions and how unresolved design items have been treated.
Separate major components such as clearing, excavation, fill, drainage, utilities, paving, and restoration. This makes it easier to identify omitted work and understand cost differences.
Examine material movements
Ask what the contractor assumes about reuse, import, export, disposal, and unsuitable material. Review the measurement basis and the process for documenting changed quantities. An inexpensive excavation rate may not include hauling or disposal costs.
For example, one bid may assume stockpiled material can remain on the property while another includes removal. Align that assumption before deciding which contractor offers better value.
Check the boundaries between contractors
Clarify who provides temporary access, utility verification, testing coordination, protection, and final grading around completed buildings. Identify the handover conditions required before foundation or modular installation work starts.
Also review the sequence and weather assumptions. A proposal should explain how ongoing drainage and access will be managed while the permanent site features are incomplete.
Compile questions in a written clarification log and obtain responses before award. The owner should finish the comparison knowing what work is included, how uncertain conditions will be addressed, and who is responsible where earthwork meets building construction. That is more informative than a single price for a broadly described site package.