An office-to-residential conversion study should test whether the existing building can support good homes and an approvable construction strategy. A floor-area calculation alone does not establish a viable apartment count.

Begin with measured geometry and building records. Floor depth, window spacing, structural bays, floor-to-floor heights, cores, and service zones influence possible layouts. Verify important dimensions rather than relying on old leasing plans.

Test representative apartment arrangements alongside circulation and support space. Daylight, privacy, usable rooms, plumbing routes, and accessible accommodation need to work together. Deep floor plates may require careful solutions that reduce the apparent efficiency of the existing office area.

Have the design team assess the change-of-use implications. Structure, fire separation, egress, accessibility, services, enclosure performance, and approvals may require significant work. Early discussion with the relevant authorities can identify questions that must be resolved before detailed design.

Investigate infrastructure capacity and replacement routes. Residential plumbing distribution and individual metering may differ substantially from the office arrangement. Reserve space for equipment and shafts before treating the unit layouts as fixed.

Build a cost and risk model with explicit assumptions about concealed conditions, enabling work, and occupied neighbors if applicable. Compare alternatives on the same scope.

The study should produce a defensible concept, a range of yield, major technical questions, and a targeted investigation plan. Proceed when the building's constraints have been translated into a credible residential design, not merely when the conversion story is appealing.