Power assumptions should be treated as dated project information that needs review when circumstances change. A service discussion based on an earlier load, customer, or schedule may no longer describe the current development. Due diligence should identify those changes before the next commitment.

Create an assumptions register with the proposed capacity, load profile, phases, connection point, timing, and supporting documents. Record the source and date for each item. Separate confirmed information from estimates and unresolved questions.

Define review triggers. A revised building use, larger load, delayed phase, changed site control, or different equipment arrangement may require consultation with the utility and design team. Do not wait for a formal transaction deadline to discover that the evidence applies to an outdated project.

Keep summaries linked to source documents. If a letter includes conditions, preserve them in the executive description. Marketing slides and investment materials should not become a parallel source of truth that outlives the underlying evidence.

Assign ownership for updates. Someone should maintain the coordinated service position and communicate material changes to development, procurement, finance, and customer-facing teams. Multiple independent spreadsheets can create conflicting capacity claims.

Before major decisions, conduct a focused currency check. Ask whether the documents still match the intended use and whether further confirmation is needed. The goal is not endless rechecking; it is ensuring that land, equipment, and schedule commitments rest on the best current information rather than on assumptions that became stale unnoticed.