Modular construction changes where some work is performed, but it still requires an applicable approval and inspection process. The responsibilities can involve factory oversight, state programs, local authorities, and site inspections, depending on the jurisdiction and building.
Identify the approval route early
Ask the supplier and design team to map which authority reviews each part of the project and which documents or labels are required. Confirm that the proposed factory and system can follow the relevant process for the destination.
ICC's off-site construction resources distinguish in-plant review and inspection from work completed at the final site. This is a useful starting point, not a substitute for checking the project's actual requirements.
Separate factory scope from site scope
Foundations, utility connections, access, installation, and site-built additions may need their own review and verification. Do not assume that factory approval automatically authorizes occupancy of the finished development.
For example, a module can arrive with completed concealed services while its connection to the site remains unfinished. Both parts need an appropriate documented pathway to acceptance.
Coordinate changes and records
Establish how design revisions are submitted and how approved information reaches production and site teams. A field modification may need review even when the original module carried the required documentation.
Include approval milestones in the schedule before committing to delivery dates. Clarify who obtains final permissions and what evidence must be available.
Owners should request a written responsibility map rather than accept a broad statement that everything is code-compliant. The goal is a clear, project-specific account of design review, factory verification, site completion, and the conditions required before the building can be used.