Factory acceptance testing examines equipment at the supplier’s facility under agreed conditions. Site acceptance testing checks the delivered and installed equipment in its project setting. The two activities serve different purposes, and neither should be assumed to replace all integrated facility testing.

Define the test scope before manufacture. Identify the requirements to be demonstrated, documentation needed, witness arrangements, acceptance criteria, and treatment of deviations. A standard factory test may not cover every project-specific function, especially interfaces that cannot be fully reproduced there.

At delivery, confirm equipment identity, condition, configuration, and accompanying records. Changes after factory testing should be documented. Transport, assembly, installation, and field connections introduce work that the factory test could not verify in its final form.

The site procedure should establish prerequisites and appropriate safety controls. Qualified teams need current drawings, settings, installation checks, and a clear understanding of the test boundary. Record actual results rather than using a signature page as the only evidence.

Plan for deficiencies and retesting. Determine who evaluates a deviation, who performs corrections, and what must be repeated before acceptance. The schedule should allow that process without forcing unresolved issues into operations.

For an owner, the useful question is what each test proves and what remains unproven. A complete acceptance plan joins factory evidence, site evidence, and system-level demonstrations into a coherent record. Passing one stage should support the next stage, not become an excuse to omit it.