Existing-condition documentation should record what is present, how confidently it is known, and where further investigation is needed. It provides the factual base for renovation design and pricing.

Start with a document review and measured survey appropriate to the project. Compare drawings, permits, maintenance records, and visible construction. Mark discrepancies rather than silently choosing one source as correct.

Use photographs systematically. Include location, direction, date, and a scale where useful. Capture service labels, access points, signs of water entry, and interfaces likely to be concealed later. An organized photograph set is more valuable than hundreds of unindexed images.

Identify concealed assumptions. Wall composition, structural connections, buried services, and conditions behind finishes may require scanning, testing, or selective opening by qualified personnel. State the limits of each method; a survey technology does not reveal every hidden condition.

Coordinate investigation with occupants and safety requirements. Access, dust, temporary protection, hazardous materials, and making good should be planned before opening the building.

Issue a clear baseline drawing set with revision control. Distinguish verified dimensions from approximate information and include the date of observation. Contractors and designers should work from the same baseline.

Update records as demolition reveals new information. A renovation's understanding of the building improves over time, and the documents should reflect that. Good existing-condition information does not eliminate uncertainty, but it makes uncertainty visible and helps the team investigate the issues that matter before committing to irreversible work.